Skip to product information
1 of 6

Petcube

Petcube GPS Tracker for Dogs – Real-Time Location Tracking, Escape Alerts &

Petcube GPS Tracker for Dogs – Real-Time Location Tracking, Escape Alerts &

Regular price $65.98 USD
Regular price Sale price $65.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

Product Overview

The Petcube GPS Tracker for Dogs – Real-Time Location Tracking is a Location Trackers product. It features 24/7 real-time gps tracking – track your dog’s live location.

Key Features

  • 24/7 Real-Time GPS Tracking – track your dog’s live location on an interactive map with continuous updates every few seconds anywhere across the US
  • Subscription Plan Required – Petcube GPS Tracker uses local cellular networks to send and receive GPS data for accurate real-time tracking; plans start at $5/month via the app
  • Long Battery Life up to 45 Days – designed for peace of mind with extended battery in power-saving mode, plus fast one-hour recharge to keep your dog always protected
  • LED Light, Sound Alerts & Glow-in-the-Dark Case – built-in beeper, LED light, and fluorescent waterproof silicone cover help you quickly locate your dog, even at night
  • Escape Alerts, Virtual Fences & Location History – set safe zones and get instant notifications if your dog leaves, review past routes, and monitor daily activity with step count and calorie tracking

Why Choose the Petcube GPS Tracker for Dogs – Real-Time Location Tracking

The Petcube GPS Tracker for Dogs – Real-Time Location Tracking offers 24/7 real-time gps tracking – track your dog’s and subscription plan required – petcube gps tracker uses. These features make the Petcube GPS Tracker for Dogs – Real-Time Location Tracking a strong option in the Location Trackers category.

Best For

The Petcube GPS Tracker for Dogs – Real-Time Location Tracking is best suited for: Geo-Fence, Location History, Real Time Tracking, Rechargeable, Water Resistant, peace of mind with extended battery in power-saving mode.

Quick Summary

The Petcube GPS Tracker for Dogs – Real-Time Location Tracking is a Location Trackers product by Petcube. Special Feature: Geo-Fence, Location History, Real Time Tracking, Rechargeable, Water Resistant. Connectivity Technology: Cellular. Battery Cell Composition: Lithium Polymer. GPS: Built-in GPS. Shape: Rectangular. Price: $65.98.

Product Specifications

Specification Details
Special Feature Geo-Fence, Location History, Real Time Tracking, Rechargeable, Water Resistant
Connectivity Technology Cellular
Battery Cell Composition Lithium Polymer
GPS Built-in GPS
Shape Rectangular
Brand Petcube
Compatible Devices Smartphone
Compatible Phone Models Compatible with iOS and Android devices
Band Material Type Silicone
Water Resistance Level Water Resistant
View full details